CATL's Jianxiawo Lepidolite Mine Clears Environmental Approval, Full Restart Targeted for Late Novem

The Jianxiawo lithium mine in Yichun, Jiangxi Province, controlled by CATL, received formal environmental impact assessment (EIA) approval from the Yichun Municipal Ecological Environment Bureau on October 30 under document Yi Huan Shen [2026] No. 53, clearing the most critical procedural hurdle for the restart of the world's largest single lepidolite (lithium mica) deposit after a suspension of nearly 14 months.

Unlike the market's earlier cautious view that EIA approval does not equate to a restart, on-the-ground checks indicate that approval largely coincides with the start of resumed operations: pollution discharge registration has been updated in parallel and excavation equipment is on site and on standby. However, the ramp-up pace may lag market expectations, as the mine must first complete ore collection, with full production expected only in late November.

At this pace, the mine is expected to contribute an incremental 10,000 tonnes of lithium carbonate in 2026. Combined with the marginal contraction in demand in November and December, there is a risk that the market could shift from destocking to stock building in December, with the weak-expectation narrative continuing to play out. The mine's approved mining scale has been reduced to 30 million tonnes of ore per year, down about 30% from the pre-suspension level of 45 million tonnes per year, which corresponds to a full-production lithium carbonate capacity of around 70,000 tonnes per year, compared with 100,000-120,000 tonnes previously.

The Jianxiawo restart has been a key compliance test case for the broader Yichun lithium mica industry. The mine's original mining license expired in August 2025, and under China's revised Mineral Resources Law, which took effect in July 2025 and classifies lithium as an independent strategic mineral, the mine had to complete a change of its main mineral type from ceramic clay (containing lithium) to lithium ore, together with reserve verification and a new lithium-mining EIA. Industry observers expect other Yichun lithium mines to follow a similar path, with most not expected to restart until the first half of 2027.

(Source: Shanghai Metals Market / SMM)